Skip to content
Get in touch
Manufacturing cluster · Guangdong

Kaiping (Shuikou town)

taps and mixers, sanitaryware, bathroom hardware

Cluster strongly geared to OEM export, many SMEs specialising in single components.

Sector
Home and furniture
Province
Guangdong
Reference trade-fair hub
about 130 km, 1.5 to 2 hours by car

What is actually made here

Specialised processing of brass and stainless steel. Potential quality is very high. The European drinking water standards, DVGW and WRAS, are known to the main producers but have to be requested explicitly. Surface finishes are good but need checking.

How the cluster is built

Medium sized firms based on heavy industry: casting, forging, machining, polishing. Electroplating and chrome plating are often outsourced to centralised industrial parks controlled by the government for environmental reasons.

Typical order minimums

Rigid. Typically 300 to 500 pieces per model, dictated by casting cycles and plating baths.

Mistakes we see repeated

First, pushing the price down too hard: the factory's incentive will be to use lighter, more zinc-rich brass alloys, or to reduce the microns of chrome plating. Second, failing to insist on water pressure testing on one hundred per cent of the pieces before packing.

In the Register of Mistakes

When not to visit or place orders

Canton Fair in Guangzhou, phase 1 or 2, and local exhibitions in Shuikou running at the same time.

The fairs that matter for this cluster

What we look at when we go

A cluster is not judged from a catalogue. On site we look at the tooling shop, the inspection logs, the spare-parts store and who answers when the owner is away. The nine phases of the method state what we deliver, and when.

The method, phase by phase

How this page was built

We would rather state what we do not know than round it off.

Verification status
Single source. Useful to get oriented, not to decide.
First source
Desk research on Chinese and international public sources: local statistical offices, industry associations, business press.
Page updated on
03/08/2026

None of these checks replaces a site visit. Distances and logistics hubs are indicative, order minimums vary by supplier and season, and Chinese public figures must be read with the original unit in mind: 亿 is 100 million, not a billion.

How it starts

We don't take on every project that comes our way

We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.