Skip to content
Get in touch
The Register of Mistakes

Twenty-three ways to lose money, collected one at a time

Not a blog organised by topic, but a register organised by mistake: twenty-three entries that come from work in the field.

Every entry has the same anatomy: what happens, why it happens, how to spot it in advance, what to do. The why is the part nobody writes, and it's the most useful: almost no mistake is born of bad faith, it's born of a margin someone is defending.

F1-01

«I found the factory, they sent me samples»

How it shows up

The samples are excellent, communication is quick and professional, certificates arrive as PDFs without hesitation. The first production run is another matter entirely. You find out once the container has already been paid for and already cleared customs.

Why it happens, the warning sign and what to do
Why it happens

The person writing to you is often not a manufacturer but a trading company. This is not an illegal disguise: it is a trade. They buy the samples from a better plant in order to close the order, then pass the job to whoever will produce it at the price that leaves them their margin. The website is theirs, the photographs belong to someone else, the certificates belong to third parties.

The signal

The mismatch between what the company claims to produce and what it is actually licensed to do, and between the declared production capacity and the indirect indicators of real activity. On paper it is almost always visible before you start.

What to do

You do not assess a sample, you assess the line that produced it. Until you have seen the plant running, you have seen nothing. The visit is not a luxury reserved for large orders: it is the only thing that tells a manufacturer apart from an intermediary.

Read the full entry: «I found the factory, they sent me samples»

F1-02

«We went with the biggest one, that way we are on the safe side»

How it shows up

The plant is immaculate, the references are international, the lead times promised are good. Then production slips, and slips again, and nobody can tell you why.

Why it happens, the warning sign and what to do
Why it happens

A small order inside a large factory is an order that can be postponed. They are not lying to you: they are putting you in the queue behind customers worth a hundred times what you are worth, and every time another one arrives the queue gets longer. In bespoke work and short runs the problem is structural.

The signal

The ratio between your order and their monthly capacity. Below a certain percentage threshold you are not a customer: you are filler.

What to do

Look for the factory where your order matters. Often it is smaller and less polished, and it treats you as the most important customer it has, because you are.

Read the full entry: «We went with the biggest one, that way we are on the safe side»

F1-03

«The supplier we approved is the one that made the goods»

How it shows up

The audit was carried out, the factory is the right one, the first batch matches the specification. Then a surprise check, or more often a minor detail, a seam, a label, a dimensional tolerance, reveals that part of the production came out of a plant you never visited and never approved. You notice when the defect has no explanation inside the factory you know.

Why it happens, the warning sign and what to do
Why it happens

An order larger than the capacity free at that moment, or a tight deadline, pushes the approved supplier to pass part of the work to a third party. The margin stays with them, the quality risk moves to a plant you have never inspected. Declaring it would mean renegotiating the schedule with you, or risking the loss of the order: not declaring it is simpler.

The signal

Variations from one batch to another from the same supplier, in details that do not depend on the product recipe (secondary packaging, markings, tolerances), without you having changed the specification.

What to do

The contract must prohibit unauthorised subcontracting and require a written declaration of every plant involved in production, before the order, not after the complaint.

Read the full entry: «The supplier we approved is the one that made the goods»

F1-04

«The MOQ is a thousand pieces, they will not go lower»

How it shows up

The quotation arrives with a minimum quantity presented as a technical fact, like weight or colour. The Italian company accepts it and ties up capital in stock it does not need, or else gives up on testing the market with a small batch.

Why it happens, the warning sign and what to do
Why it happens

The stated MOQ covers the fixed start-up costs the supplier does not want to spread over a small order: tooling changeover, line setup, minimum raw material intake from its own upstream supplier. It is a figure built around what suits the supplier at the moment of writing, not a physical limit of the machine.

The signal

The MOQ proposed for the first order, when no relationship exists yet: it is almost always higher than the MOQ the same supplier grants to a customer it has worked with for some time.

What to do

Treat the MOQ as a line in the quotation, not as a limit. Ask for the breakdown between material, setup and margin, and check whether a lower MOQ at a higher unit price works out better for a first trial order.

Read the full entry: «The MOQ is a thousand pieces, they will not go lower»

F2-01

«We approved the sample, we are covered»

How it shows up

The sample approved by email or from a photograph. Production arrives similar but not identical, and the argument over who is right never closes, because there is no shared physical reference.

Why it happens, the warning sign and what to do
Why it happens

Without a physical specimen sealed and countersigned by both parties, "approved" is an opinion. A photograph will not hold: colour, finish and grain lie under different lighting, and burnished metals lie always.

The signal

If nobody has asked you to seal and sign two identical specimens, one for each party, the process is not a process.

What to do

A physical golden sample, sealed, countersigned and dated. It is the cheapest item in the project and it is the one that settles ninety per cent of disputes in advance.

Read the full entry: «We approved the sample, we are covered»

F2-02

«The first two orders were perfect»

How it shows up

First batch compliant. Second batch compliant. From the third the specification starts to drift, one degree at a time. No change visible to the naked eye. The returns from end customers come in a year or two later.

Why it happens, the warning sign and what to do
Why it happens

This is not sudden fraud, it is margin management. The price of the raw material moves, your purchase price does not, and the difference is recovered where it cannot be seen: a slightly different alloy, thickness at the lower limit of tolerance, a shortened treatment. The first orders serve to build the trust that makes the third one possible.

The signal

The absence of recurring inspection. If nobody checks anything after the first batch, the incentive to drift meets no obstacle.

What to do

Make compliance the cheaper option. A right to take samples for testing at a third-party laboratory, at the supplier's expense in the event of non-conformity, is not an aggressive clause: it is a clause that changes the economic calculation on the other side.

Read the full entry: «The first two orders were perfect»

F2-03

«The inspection came back passed»

How it shows up

The inspection report says "passed", the batch ships. Some of the pieces that reach the end customer still show the defect the inspection should have caught.

Why it happens, the warning sign and what to do
Why it happens

A sampling inspection does not check one hundred per cent of the batch: it checks a statistically defined portion and accepts the batch if defects stay below a threshold agreed in advance. Since 1999 that threshold has been called the acceptance quality limit (AQL), not the acceptable quality level: it is the maximum tolerated, not a level to be regarded as acceptable. "Passed" does not mean zero defects: it means defects below the chosen threshold. If the threshold is loose, or if critical, major and minor defects have not been distinguished, the inspection protects you less than it appears to.

The signal

An inspection report that gives only the final outcome, without stating the standard and the sampling plan used, the sample size and the acceptance limits applied for each defect category.

What to do

Set out in writing, before the order, the sampling standard and the limits for each defect category: ISO 2859-1, general inspection level II, separate AQLs for critical, major and minor defects. Do not leave them to the inspector's discretion on the day of the inspection.

Read the full entry: «The inspection came back passed»

F3-01

«I paid for the mould, so it is mine»

How it shows up

You paid for the mould or the tooling, sometimes in full. The day you want to change supplier you discover that the mould is not going anywhere.

Why it happens, the warning sign and what to do
Why it happens

Having paid does not make you the owner, if the contract does not say so. And the mould, for the supplier, is precisely what keeps you there: it is the only reason you cannot walk away tomorrow. They have no interest at all in clearing up the ambiguity.

The signal

The contract contains no clause stating who owns the mould, where it is kept and at what notice it can be collected.

What to do

Ownership, place of custody, physical marking and the right to remove the tooling, in writing before payment, not after. The same rule applies to drawings, models and production files.

Read the full entry: «I paid for the mould, so it is mine»

F3-02

«I have registered the trade mark in Italy»

How it shows up

You discover that somebody else has registered your trade mark in China. In the worst version it was done by a party close to your own supply chain, and now your own goods cannot leave the country.

Why it happens, the warning sign and what to do
Why it happens

China operates a first-to-file system: the right goes to whoever registers first, not to whoever uses first. Registering other people's trade marks before they arrive is an organised activity with a business model of its own. Chinese law does prohibit it and remedies do exist, but they are slow, expensive and uncertain in outcome: that is exactly what makes filing in advance the cheapest line in the project.

The signal

There is no visible signal. This is the mistake you prevent rather than diagnose, and it is also the cheapest to prevent relative to the damage.

What to do

File in China before the first commercial contact, not after the first order. That includes the transliteration into Chinese characters, which is the part almost everyone forgets and the one your brand will actually be called by. If somebody has already filed, it is not over: opposition within three months of publication, an invalidation action, or cancellation for three years of non-use, which is the tool most often used against parties who file in order to resell. You will need a Chinese agent, evidence of use and several months.

Read the full entry: «I have registered the trade mark in Italy»

F4-01

«The supplier sent me the CE certificate»

How it shows up

You receive a document bearing the CE mark and the stamp of a body with an authoritative-sounding name. The goods are stopped or, worse, placed on the market and then withdrawn.

Why it happens, the warning sign and what to do
Why it happens

For many product categories CE marking is not a certificate issued by somebody: it follows from an EU declaration of conformity, and that declaration is drawn up by the manufacturer, including a manufacturer established outside the Union. You do not inherit it and you do not sign it in their place: you have to check that it exists, that it covers that exact product, and that the technical file is available. Your own importer obligations then remain, and they are separate ones that no contract can push back up the chain. You become the manufacturer only if you place the product on the market under your own brand or modify it substantially.

The signal

If somebody is selling you "CE certification" as a product in its own right, they are almost always selling you something that does not exist in that form. The same goes for a declaration that names neither the manufacturer, nor the directives applied, nor the standards used.

What to do

Obtain from the manufacturer the EU declaration of conformity and access to the technical file, and check that they cite the right directives and standards for that product. Check, category by category, whether a notified body is genuinely required or whether the assessment falls to the manufacturer. If you sell under your own brand, the technical file has to be built as your own.

Read the full entry: «The supplier sent me the CE certificate»

F4-02

«The goods were compliant when they shipped»

How it shows up

An order compliant with the rules in force at the time of signature. It arrives once the rules have changed. Goods paid for, in the warehouse, unsaleable in Europe.

Why it happens, the warning sign and what to do
Why it happens

Because nobody looks at the calendar. Months pass between signature and customs clearance, and in those months restrictions published long before come into application. The supplier is under no obligation to know European law, and the adviser who helped you buy often looks at the moment of the order, not the moment of arrival.

The signal

In the specification, compliance is written in the present tense. It must be written in the future tense: compliant with the rules in force at the expected date of placing on the market.

What to do

A dated regulatory map, built at the start of the project, listing the deadlines that will fall between signature and arrival. Then the contract clause that moves the risk to the right moment.

Read the full entry: «The goods were compliant when they shipped»

F4-03

«The supplier sends us the product already compliant»

How it shows up

The product arrives in Europe, it is sold, and a market surveillance check, or an accident, opens a case. The Italian company discovers that it is the party required to answer, not the Chinese supplier.

Why it happens, the warning sign and what to do
Why it happens

Regulation (EU) 2023/988 on general product safety (GPSR) has applied since 13 December 2024. Article 16 prohibits placing a product on the market unless there is an economic operator in the Union responsible for the tasks listed in Article 4 of Regulation (EU) 2019/1020. Where the manufacturer is outside the Union and has no representative in Europe, that operator is not somebody you identify: it is somebody you are. A company importing directly is the importer, and by definition the importer is the responsible operator, from the moment the goods are cleared. From then on it has to hold the technical documentation, cooperate with the market surveillance authorities and make its contact details visible on the product or its packaging. The Chinese supplier has no incentive to deal with it: the European rules do not concern them directly.

The signal

No European economic operator named on the product, the packaging or the accompanying documents, or a technical file received from the supplier and never checked in-house.

What to do

Treat those obligations as your own before the first shipment, not after a complaint: technical file and safety assessment checked in-house, company name and contact details printed on the product or its packaging, a written procedure for recalls and notifications. It is work done once that covers the whole range.

Read the full entry: «The supplier sends us the product already compliant»

F4-04

«Packaging is not the product, nobody checks it»

How it shows up

The container arrives and the transport packaging (cartons, pallets, void fill) has never been declared to any consortium. The first inspection, or the first notice, comes when import volumes are already substantial, with arrears of contributions to be paid in one go.

Why it happens, the warning sign and what to do
Why it happens

In Italy the extended producer responsibility system for packaging is run by CONAI and applies to whoever places packaging on the Italian market: this includes anyone importing packaged goods from a non-EU country, who for the purposes of the rules takes the place of the producer. Regulation (EU) 2025/40 on packaging (PPWR), with obligations in force from 12 August 2026, harmonises the principle at European level. Those who do not know simply do not declare, because no document from the Chinese supplier flags it.

The signal

No CONAI registration in place despite regular imports of packaged goods, or a supplier who never provides the weight and material data for the packaging used.

What to do

Check your own position as a packaging user from the first structured order onwards, and ask the supplier for packaging composition data as part of the standard shipping documentation.

Read the full entry: «Packaging is not the product, nobody checks it»

F5-01

«They wrote to tell me the IBAN has changed»

How it shows up

An email arrives from your usual contact, with the same style and the same conversation history, announcing a change of bank details for the balance. The transfer goes out. The supplier never sees it.

Why it happens, the warning sign and what to do
Why it happens

This is one of the most widespread frauds in international trade and it requires no sophisticated technical skill: access to one mailbox is enough, usually the less protected of the two. The moment chosen is always the same, the final balance, when the rush is at its peak and suspicion at its lowest.

The signal

Any change of bank details notified by email. Without exception, even when everything else is perfect. Especially when everything else is perfect.

What to do

A fixed rule, written into the contract: bank details are set at the outset and every change must be confirmed on a different channel, with a named and identified person, before any payment. It costs five minutes and it is worth the entire balance.

Read the full entry: «They wrote to tell me the IBAN has changed»

F5-02

«We pay by advance bank transfer, it is simpler»

How it shows up

The order goes out with a T/T transfer, often part up front and the balance before shipment. Everything is fine as long as everything is fine. When something goes wrong, a delay, a non-conformity, a supplier who disappears, the Italian company discovers it has no leverage at all: the money has already gone and no bank is holding it as security.

Why it happens, the warning sign and what to do
Why it happens

The bank transfer is the simplest and cheapest instrument for both parties, and it is also the one that moves the entire risk of non-performance onto the buyer. The letter of credit, governed by the uniform rules of the International Chamber of Commerce (UCP 600), commits a bank to pay only against conforming documents: it costs more in bank charges and carries a risk of its own, because a small error in the shipping documents can block payment even when the goods are perfectly in order.

The signal

No discussion of the payment instrument at the start of the negotiation, and an identical payment schedule regardless of the value of the order, the history with that supplier and the country of destination.

What to do

Choose the payment instrument on the basis of the value of the order and the age of the relationship, not out of habit. On significant orders with a new supplier, a letter of credit or intermediate instruments are worth the bank charges.

Read the full entry: «We pay by advance bank transfer, it is simpler»

F5-03

«There were no extra duties in the quotation»

How it shows up

The order is confirmed, the container has sailed, and at the customs declaration an anti-dumping duty appears that nobody had budgeted for, often well above the ordinary customs duty.

Why it happens, the warning sign and what to do
Why it happens

The European Union applies specific anti-dumping duties, category by category and sometimes producer by producer, on products originating in China found to be sold below market price. In 2025 and 2026 alone these covered, among others, headless screws (Regulation (EU) 2025/2153), tyres for cars and vans (Regulation (EU) 2026/1540), mobile access equipment, and ceramic tableware, where since 7 February 2026 a single rate of 79 per cent applies to every Chinese producer (Regulation (EU) 2026/274). The measures accumulate, change and are renewed through regulations published in the course of the year, and they do not appear in the price the supplier quotes: it does not suit the Chinese supplier to flag them, because the price then looks less competitive.

The signal

No check of the product's Combined Nomenclature code against the TARIC database before confirming the order, to see whether that heading is already subject to trade defence measures or is the subject of an ongoing investigation.

What to do

Check the customs code and the status of anti-dumping measures on the specific product before confirming the order, not at the customs entry, when it is too late to renegotiate the price.

Read the full entry: «There were no extra duties in the quotation»

F5-04

«We held back the balance until we had checked everything»

How it shows up

The Italian company holds back part of the payment as security after accepting the goods, convinced that this is common practice. The supplier sees it as a one-sided anomaly, the relationship sours, and on the next batch they ask for one hundred per cent payment in advance to protect themselves.

Why it happens, the warning sign and what to do
Why it happens

In commercial practice with Chinese suppliers the most widespread arrangement is a deposit on order confirmation and the balance on shipment or on pre-shipment inspection, not a deferred payment after arrival in Italy. A retention as security after acceptance, if it has not been negotiated and written into the contract from the outset, shifts a liquidity risk onto the supplier that they never accepted, and which they tend to pass back anyway, in advance, through the price or the terms of the next order.

The signal

A retention clause introduced once the order is already confirmed, or put forward as a one-sided demand rather than as a term negotiated before the contract.

What to do

If security after delivery is needed, negotiate it as an explicit clause in the original contract, with a defined amount and duration, not as a practice imposed once the payment arrangement has already been set up differently.

Read the full entry: «We held back the balance until we had checked everything»

F5-05

«The price is fixed for the whole year, we put it in the order»

How it shows up

The unit price is locked in the annual order. A few months later the supplier asks for a revision, citing the rise in the cost of a raw material, and it is handled as an emergency to be dealt with case by case, each time with less bargaining power because the order is already in production.

Why it happens, the warning sign and what to do
Why it happens

A fixed price protects the buyer when raw materials fall and protects the supplier when they rise, but neither party says so openly during the negotiation. Without a clause linking the price to a verifiable index, every movement becomes a discussion to be had again from scratch, at the very moment when the supplier has the most leverage because production is already under way.

The signal

A contract that sets a single stable price for products whose bill of materials contains a volatile raw material component (metals, oil-based plastics, some textiles), with no reference to an index.

What to do

Isolate the raw material share within the price breakdown and link it to a verifiable public index, leaving the processing and margin share fixed. The discussion moves from "how much" to "which index", and it is had once only, at the start.

Read the full entry: «The price is fixed for the whole year, we put it in the order»

F6-01

«We took the ex works price, it is the lowest»

How it shows up

Compared with the others the price looks excellent. Then the costs that were not in the quotation arrive and the advantage evaporates, along with weeks of time.

Why it happens, the warning sign and what to do
Why it happens

The incoterm is not an administrative detail: it decides who does what, who pays for what and, above all, where the risk passes. An ex works price and a price with the goods loaded on board are not comparable, and whoever puts them in front of you knows that perfectly well.

The signal

Different quotations on different incoterms, placed in the same table.

What to do

Normalise every quotation to the same incoterm before comparing them, and choose the incoterm on the basis of who really controls that leg of the journey, not on the basis of which figure looks lower.

Read the full entry: «We took the ex works price, it is the lowest»

F6-02

«Delivery end of January, we have given ourselves some slack»

How it shows up

The order is confirmed well ahead of Chinese New Year. Then the factory slows down two or three weeks before the holiday, stops for an official week that easily becomes a month between the early shutdown and the slow return of the workforce, and the margin that looked generous is used up entirely.

Why it happens, the warning sign and what to do
Why it happens

Chinese New Year is the period when much of the migrant workforce goes back to its home province, often not to return to the same factory: the return after the holiday means weeks of recruiting and training new staff before production is back at full rate. The same mechanism, on a smaller scale, applies to Golden Week at the beginning of October. No supplier has any interest in being the first to report a slowdown: they would rather see whether they can catch up on their own.

The signal

A promised delivery date falling in the four to six weeks before the holiday or the two to three weeks after it, without a production slot booked well in advance.

What to do

Build the production schedule backwards from the holiday, not forwards from the order date, and ask for written confirmation of the reserved production slot before the factory fills up with other customers.

Read the full entry: «Delivery end of January, we have given ourselves some slack»

F6-03

«The supplier sent us the inspection report»

How it shows up

The document with photographs, measurements and a positive outcome arrives before shipment, signed by the factory's own quality department. The container reaches Italy with defects the report never mentioned.

Why it happens, the warning sign and what to do
Why it happens

Whoever produces and whoever inspects, if they are the same person, share the same interest: getting the container away on the promised date. An inspector employed by the factory has no incentive to hold a batch that his own employer needs to invoice, above all when the customer has not explicitly asked for an independent check.

The signal

An inspection report with no third-party letterhead, no stamp or signature from an identifiable external inspector, or simply never requested because "the supplier is reliable".

What to do

The pre-shipment inspection must be commissioned and paid for by the buyer, from a party with no commercial ties to the supplier, with direct access to the batch before loading.

Read the full entry: «The supplier sent us the inspection report»

F6-04

«The customs code was put in by the freight forwarder»

How it shows up

The goods clear customs without trouble for several shipments. Then comes an inspection, often a random one, which reopens the classification used up to that point, with retroactive effect on earlier shipments still open to assessment.

Why it happens, the warning sign and what to do
Why it happens

Correct customs classification is the responsibility of the economic operator declaring the goods, even when the code is physically entered by the freight forwarder on the basis of the information received. The Union Customs Code (Regulation (EU) 952/2013) assigns classification to the Combined Nomenclature and the TARIC integrated tariff. A wrong code means recalculating the charges not paid. Where the discrepancy is deliberate, in Italy since 4 October 2024 it is called smuggling by inaccurate declaration (Article 79 of Legislative Decree 141/2024) and carries a fine of 100 to 200 per cent of the border charges due: it starts at twice what the declaration was meant to save.

The signal

No Binding Tariff Information (BTI) requested for products whose classification is ambiguous or newly introduced, and a customs code "inherited" from an earlier shipment without ever having been checked from scratch.

What to do

For new products or products of doubtful classification, apply for Binding Tariff Information from the Italian customs authority before starting shipments: it is a binding decision valid throughout the Union, and it closes the discussion in advance rather than after an assessment. If the error has already been made, there is a way out that almost nobody uses: a revision of the declaration requested by the declarant before notice of an inspection arrives rules out both the administrative penalty and confiscation.

Read the full entry: «The customs code was put in by the freight forwarder»

F7-01

«He said yes»

How it shows up

Every request is confirmed. No objection, no request for clarification. Then production does not match what was confirmed.

Why it happens, the warning sign and what to do
Why it happens

In many relational settings "yes" closes the awkwardness of the moment and commits to nothing on substance. It can mean "I heard you", "I will try", or "I do not want to say no to you right now". This is not duplicity: it is a different way of handling disagreement, in which openly contradicting the person in front of you carries a social cost people prefer to avoid. The mistake is ours, when we treat that yes as a commitment.

The signal

The complete absence of objections. A competent supplier who never raises a single issue on complex specifications almost always has not read them, or has already decided to handle them their own way.

What to do

Never ask whether something can be done. Ask how it will be done, who will do it and on which machine. An open question cannot be closed with a yes.

Read the full entry: «He said yes»

The register grows with every project we close. Regulatory references are checked as of the date shown on each entry: rules change, and when they do, we update it here.

How it starts

We don't take on every project that comes our way

We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.