Skip to content
Get in touch
Manufacturing cluster · Zhejiang

Liushi

low voltage electrical components, circuit breakers, switchboards

Known as the Electrical Capital of China, with a strong presence of companies able to certify to CE.

Sector
Industry, machining, metals
Province
Zhejiang
Nearest airport
Wenzhou Longwan Airport, or the Port of Wenzhou 35 km, 45 minutes
Reference trade-fair hub
about 400 km from Shanghai, 2.5 to 3 hours by high-speed train

What is actually made here

manufacturers of circuit breakers, contactors, switchboards, cables and sockets. Quality ranges from export-oriented suppliers certified to CE and CCC to small manufacturers serving the domestic market with weaker technical documentation; price positioning is low to mid. Straightforward: cosmetic customisation of switches and faceplates. Difficult: genuine electrical safety certification, which requires breaking capacity testing and not merely visual checks.

How the cluster is built

historic "shop at the front, factory at the back" model (前店后厂): thousands of small component workshops around a few large leading firms headquartered in Liushi and Yueqing (among them Chint/CHNT and Delixi). Automation is increasing in the larger firms, while the small workshops moulding plastics and bakelite for enclosures remain largely manual.

Size: 2024 industrial turnover of RMB 106.76 billion, first place in the Zhejiang top 1,000 ranking

Typical order minimums

standard components (switches, sockets) MOQ 1,000 to 5,000 pieces, negotiable; custom switchboards carry a much lower MOQ (even a few dozen units) as they are engineered to order.

Second source: 500 to 1,000 pieces per item code

Mistakes we see repeated

first, assuming that CCC certification (mandatory for the Chinese market) is equivalent to European CE marking: they are different standards with different tests, and a CCC compliant product is not automatically CE compliant. Second, substitution of the electrical contact material (silver replaced by a cheaper alloy) in contactors, invisible to a visual check but decisive for service life and safety under continuous use. Third, no verification of the declared breaking capacity (in kA) of circuit breakers: the figure on the label does not always correspond to an actual test unless the buyer explicitly asks for a test report from an independent laboratory.

  • Trusting internal wiring and contacts made of copper-clad aluminium or low-grade alloys rather than pure copper.
  • Importing without a genuine TUV or CE certificate issued in the buyer's name.

In the Register of Mistakes

When not to visit or place orders

a local electrical fair in Yueqing (name and frequency not confirmed against a reliable source) [TO BE CONFIRMED]; Canton Fair phase 1 in Guangzhou is also useful. Avoid Chinese New Year.

Second source: February, Chinese New Year.

What we look at when we go

A cluster is not judged from a catalogue. On site we look at the tooling shop, the inspection logs, the spare-parts store and who answers when the owner is away. The nine phases of the method state what we deliver, and when.

The method, phase by phase

How this page was built

We would rather state what we do not know than round it off.

Verification status
Specialisation confirmed by two independent sources. Size figures still need to be checked on site.
First source
Desk research on Chinese and international public sources: local statistical offices, industry associations, business press.
Independent second source
Cross-check with a second research system, August 2026. RMB 139.9 billion (1399 亿元) (2021) Open the source
Page updated on
03/08/2026

None of these checks replaces a site visit. Distances and logistics hubs are indicative, order minimums vary by supplier and season, and Chinese public figures must be read with the original unit in mind: 亿 is 100 million, not a billion.

How it starts

We don't take on every project that comes our way

We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.