«The MOQ is a thousand pieces, they will not go lower»
How it shows up
The quotation arrives with a minimum quantity presented as a technical fact, like weight or colour. The Italian company accepts it and ties up capital in stock it does not need, or else gives up on testing the market with a small batch.
Why it happens
The stated MOQ covers the fixed start-up costs the supplier does not want to spread over a small order: tooling changeover, line setup, minimum raw material intake from its own upstream supplier. It is a figure built around what suits the supplier at the moment of writing, not a physical limit of the machine.
The signal to catch
The MOQ proposed for the first order, when no relationship exists yet: it is almost always higher than the MOQ the same supplier grants to a customer it has worked with for some time.
What to do
Treat the MOQ as a line in the quotation, not as a limit. Ask for the breakdown between material, setup and margin, and check whether a lower MOQ at a higher unit price works out better for a first trial order.
Other entries in the same family
The other entries gathered under Supplier. Different mistakes, same root.
Where this entry comes from
We would rather state what we do not know than round it off.
- How it is built
- From the field: what we have seen inside factories and when containers were opened, and what clients told us.
- Why there are no names
- Entries are anonymised. Company, supplier and personal names stay out of it, out of respect for the confidentiality of those who told us their story: the judgement can be shared, the name cannot.
- How it grows
- The Register gets longer with every trip. When an entry is added, or when an entry changes because a rule has changed, the date below moves.
- Entry updated on
- 03/08/2026
An entry in the Register is not advice on your case. It describes a recurring mechanism and says where to start looking: checking your product, your contract and your supplier still has to be done, and it has to be done with someone who can sign off on it.
We don't take on every project that comes our way
We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.